Call Us

+1

Email

Invest in Bitcoin Mining Infrastructure with Bitcoin Capitalist

Bitcoin Capitalist: Partnering in Bitcoin Mining Infrastructure

Bitcoin Capitalist is leveraging energy and legal mining contracts in Dubai, UAE, as we develop our first mining sites in the region. By focusing on infrastructure and adopting a “landlord” model, we generate significant returns through the difference between energy costs and the prices charged to customers.

We are now accepting investments in air-cooled Bitcoin mining containers, custom-manufactured in China. These containers are produced to order, with a two-month production timeline and an additional month for shipping to Dubai.

Highlights of Our Mining Containers

  • Capacity: Each 20ft container holds 162 Bitcoin miners and consumes 0.7 MW of energy.
  • Quality: Precision-engineered with heat-treated materials, premium wiring, and top-tier components.
  • Warranty: Includes a one-year manufacturer warranty on the container and all major components.
  • Pricing: $45,000, which covers manufacturing, shipping, import taxes, and delivery to the site. Delivery requires two forklifts for installation.

50/50 Investment Partnership with Bitcoin Capitalist
We are offering investors a chance to partner with us on this scalable mining infrastructure.

  • Our Role: Bitcoin Capitalist will handle logistics, taxes, installation, site setup, energy acquisition, site management, and customer acquisition for hosting services.
  • Your Role: Co-invest in the mining containers and share the profits.

By combining Bitcoin Capitalist’s expertise with your investment, we aim to deliver consistent and attractive returns in the growing Bitcoin mining sector

Mining Container Specifications

  • Dimensions: 5950 x 2255 x 2555 mm (L x W x H)
  • Miner Capacity: 162 miners (maximum)
  • Input Voltage: 380V~415 VAC, 50/60 Hz
  • Power Capacity: 700 kW
  • Safety Standard: UL-certified
  • Appearance Color: RAL 7035 Light Grey (customizable)
  • Transportation: Standard container shipping


Monthly Estimates – Hosting Charge – Energy Cost ($0.015 kWh) = Profit:

  • Hosting at $0.06/kWh:
    $30,681 – $7,670.25 = $23,010.75
  • Hosting at $0.065/kWh:
    $33,237.75 – $7,670.25 = $25,567.50
  • Hosting at $0.07/kWh:
    $35,794 – $7,670.25 = $28,123.75

Annual Estimates for 1 Container

  • Hosting at $0.06/kWh: $23,010.75 x 12 Months = $276,129
  • Hosting at $0.065/kWh: $25,567.50 x 12 Months = $306,810
  • Hosting at $0.07/kWh: $28,123.75 x 12 Months = $337,485
Share the Post:

Related Posts

Bitcoin Capitalist is on a mission to advance global Bitcoin adoption and education, empowering people to expand their financial freedom.

Our Blog Post

Bitcoin Capitalist Talks Mining, Adoption, and the Future of Bitcoin with Desencryptada

In this exclusive interview with Desencryptada in Buenos Aires, the Bitcoin Capitalist shares...

Invest in Bitcoin Mining Infrastructure with Bitcoin Capitalist

Bitcoin Capitalist: Partnering in Bitcoin Mining Infrastructure Bitcoin Capitalist is leveraging...

Crypto Conversations in Dubai: My Interview with Maria Andersen

This month, while working in Dubai, I had the pleasure of appearing on Maria Andersen’s Crypto...

Inside America’s Largest Bitcoin Hydro Mining Facility

How Sustainable Hydroelectric Power is Driving the Future of Bitcoin Mining in Spokane, Washington I...

© 2023 Created bitcoincapitalistshop.com